运营和项目

我们的一级资产组合提供包括铜、铂族金属、镍、锌和其他对全世界向清洁能源和低碳经济转型而言至关重要的金属的敞口。我们的股东受益于高品位、低成本、低资本密集度的长期项目以及卓越的 ESG 计划。

南非

Platreef 铂族金属-镍矿

所有权:Ivanhoe Mines 64%
《全面提高黑人经济实力法案》合作伙伴持股 26% | 伊藤忠商事株式会社领衔的日本财团持股 10%

Platreef is the world's largest undeveloped precious metals project. It is a tier-one discovery of platinum-group metals, nickel, copper and gold by Ivanhoe Mines’ geologists on the Northern Limb of South Africa’s Bushveld Igneous Complex, the world’s premier platinum producing region. Platreef 与其他 Bushveld 项目的不同之处在于,它在品位、矿床厚度、结构、规模和可观的镍和铜副产品收益潜力方面具有非凡的组合。

下载综合开发计划

77 万吨

Platreef 第 1 期选矿产能

4.1 百万吨/年

第 1 期和第 2 期选矿厂的选矿产能合计

450koz

第 2 期的 3PE+Au 平均年产量(盎司)

9500 万盎司

3PE+AU 矿产资源储量

270 万吨

镍矿产资源储量

10.7 百万吨/年

Phase 3 expansion processing capacity as covered in 2025 Preliminary Economic Assessment

Construction of Phase 1 concentrator was completed early in the third quarter of 2024.  Cold commissioning started in 2024 年 7 月, with water being fed through the concentrator and first ore is scheduled for 2025.  The concentrator will be placed on care and maintenance until Q4 2025, as Shaft #1 prioritizes the hoisting of waste from the development required to bring forward the start of Phase 2.  Construction of the headframes for Shaft #2 and Shaft #3 are well advanced.

Two independent technical studies were completed in early 2025 on the Phase 2 and Phase 3 expansions at Platreef.   This includes an updated Feasibility Study on the Phase 2 expansion to 4.1 Mtpa of processing capacity (4.1 Mtpa FS), followed by a Preliminary Economic Assessment covering a new Phase 3 expansion to 10.7 Mtpa of processing capacity (10.7 Mtpa PEA). See news Feb 18,2025, news release.

Construction of Platreef’s 5-MW solar power facility was completed in early Q1 2025. 此发电厂产生的电力,将与预计陆续引入的其它可再生能源一起,为开放活动与运营提供支持。

Platreef 项目预计将成为全球最大型、成本最低的钯、铂、铑、镍、铜和金生产商之一。

Phase 1 & 2 Feasibility Study

The study outlines Phase 1 production from Q4 2025, followed by the Phase 2 expansion 2 years later in Q4 2027. Phase 2 delivers, as outlined in the 4.1 Mtpa FS, a near five-fold increase in platinum, palladium, nickel, rhodium, and gold production to over 460,000 oz. of 3PE+Au, plus approximately 9,000 tonnes of nickel and 6,000 tonnes of copper. The 4.1 Mtpa FS generates a net present value (NPV8%) of $1.4 billion and an internal rate of return (IRR) of 20%, at consensus long-term metal prices.

The Largest Undeveloped Precious Metals Deposits

Platreef is one of the largest undeveloped precious metals deposits globally, with 56 million oz in platinum equivalent Indicated Mineral Resources and 74 Moz in platinum equivalent Inferred Mineral Resources, at a 2.0 g/t 3PE+Au cut-off. Platreef is also one of the world’s largest undeveloped nickel sulphide resources.

2025 Preliminary Economic Assessment (PEA)

The 10.7 Mtpa PEA considers the Phase 3 expansion once the major Shaft #2 is available for hoisting in 2029. This expansion further doubles the annualized platinum, palladium, rhodium, and gold production to over 1 million ounces of 3PE+Au, plus approximately 22,000 tonnes of nickel and 13,000 tonnes of copper. The 10.7 Mtpa PEA is expected to rank Platreef as one of the world’s largest primary platinum group metal producers on a platinum-equivalent basis.

技术报告

查看文档库
Platreef Integrated Development Plan 2025, 2025 年 3 月
普拉特瑞夫 2022 年可行性研究,2022 年 3 月
Platreef 2020 年综合开发计划, 2020 年 12 月
Platreef 2017 年可行性研究,2017 年 9 月
Platreef 项目 - 2016 年资源技术报告,2016 年 6 月
Powered by Translations.com GlobalLink Web SoftwarePowered by GlobalLink Web